We stopped by the property on our way home from NC this afternoon to check on progress. The 3rd floor looks to be done framing and the 4th should be done by the end of this week.
Full front.

Here is the front of the building, third floor/our first floor.

A pic of the back of our unit.

This is our deck and exhaust cutout for the AC unit.

Here is the balcony for our master suite.

Our deck off of the kitchen/family room and our balcony.

The current inside view from our hallway up to the ceiling of the 2nd floor.

Here are the pipes they had to fix. They were outside of the walls so they had to move them over a bit to get them within the walls.

Another of the same pipe.

A pipe that was in the garage re-routed.